TOMATO PROJECT RFQ AND SCOPE WORKSHEET — blank buyer document Version 2026-11-05 | tomatopasteprocessingline.com No values in this worksheet are measured results, equipment guarantees or acceptance evidence. Route: [Fresh Tomato to Paste / Bulk Paste to Ketchup / Puree Preparation] Incoming material and first supplied machine: Raw tomato lot or purchased paste specification: Finished paste/puree/ketchup identity, solids method, texture and assessment temperature: Capacity value, unit, measurement point and operating window: Accepted whole-fruit feed / refined pulp feed / final packed product (keep distinct): Whole-fruit no-loss comparison, if used, with assumptions and excluded rejects: Measured evaporation inlet/outlet data and utility conditions: Bulk bag specification or retail can/container specification: Equipment already retained and exact handover conditions: Supplier-supplied equipment, controls, connections and documents: Buyer/other-party utilities, civil work, piping, electrical and access: Open cleaning access and closed CIP supply/return responsibilities: Process validation, installation, training and release owners: FAT/SAT material, duration, instruments, samples, criteria and witnesses: Schedule, exclusions and items requiring project confirmation: Reported references: Niger September 2022 receives bulk paste and packs 400 g / 2.2 kg cans; Moldova 2024 is a multi-material puree front end reported at 1000 L/h. These references do not populate your acceptance record.